Circulating tube colloid mill

Circulating tube colloid mill

20-10-2023

Colloid millStainless steel colloid millSoybean milk colloid mill

 The quotation for this product is a reference price, and the specific specifications and prices of the product will be discussed in detail! Shipping is not supported if directly taken without contact!

 Colloid mill installation: 1. The equipment is installed horizontally on a flat concrete foundation and fixed with foundation screws (it may not be fixed according to working conditions). 2. Check

 if all fastening screws are tightened (the rotor center screw is an M12 left-hand screw). 3. Before use, use a special wrench to rotate the rotor and check for contact with the stator and any jamming.

 If any of the above conditions occur, it is not allowed to start the machine. 4. Check and connect the power cord (three-phase AC, voltage 380V, body protection grounding) and note that the rotor

 rotation direction should be consistent with the arrow on the base (clockwise rotation). 5. Connect the cooling water and pay attention to the water inlet and outlet signs of the water nozzle. 6. When

 starting the motor, first press the switch to check for any noise or vibration. If the situation is not normal, immediately shut down the machine, eliminate the fault, and then try running again.

 When cleaning residual materials in the stator and rotor after the colloid mill is in operation, the large chuck should be rotated counterclockwise by no less than 90 ° before cleaning.